Costs & Pricing

8
  • How to Read and Compare Shed Quotes Like for Like
  • The Costs People Forget: Foundations, Site Work, Consent and Cartage
  • Pole Shed vs Steel Portal Frame: The Real Cost Comparison
  • Kitset or Full Design & Build: Which Works Out Cheaper?
  • Investment Boost: A 20% Upfront Tax Deduction on a New Commercial Building
  • What Does a Commercial or Industrial Building Cost per m² in 2026?
  • American Barn Prices in NZ: What You Get for Your Money
  • How Much Does a Steel Shed Cost in NZ? A 2026 Price Guide

Consents & Rules

7
  • How Long Does a Commercial Building Consent Take, and How Do You Avoid Delays?
  • Insulation (H1) Rules: When a Shed or Commercial Building Needs Them
  • What the 2026 Building Amendment Bill Means for People Building
  • Fire Rules for Commercial Steel Buildings, in Plain English
  • Building Consent vs Resource Consent: Height, Boundaries and Site Coverage
  • Consent-Exempt Farm Sheds up to 110 m²: What Actually Qualifies
  • Do I Need Building Consent for a Shed in NZ? The 2026 Rules

Planning & Design

17
  • Plant Rooms and Equipment Buildings: Steel Buildings for Infrastructure
  • Extending an Existing Building: New Bays, Lean-tos and Matching the Old
  • Hobby Sheds and She Sheds: Small Steel Buildings With a Purpose
  • Aircraft Hangars: Sizes, Doors and Consent
  • Mezzanine Floors in Sheds and Commercial Buildings: Timber, Steel or Concrete?
  • Canopies and Covered Loading Areas for Commercial Sites
  • Warehouse Design That Can Grow With Your Business
  • Hay Barns: Keeping Feed Dry (and Safe) Through NZ Weather
  • Commercial Storage Units as an Investment: What to Plan Before You Build
  • Designing a Workshop Shed: Power, Light, Insulation and Mezzanine
  • Picking the Right Site for Your Shed: Access, Slope, Ground and Orientation
  • Choosing Doors for Your Shed: Roller, Sectional, Sliding or Open Bays
  • Lifestyle Block Sheds: Workshop, Storage, Boat and Caravan in One Building
  • Designing a Farm Implement Shed Around Today’s (and Tomorrow’s) Machinery
  • Clear Span Explained: No Internal Posts, No Knee Braces, up to 30 m
  • How High Should Your Shed Be?
  • What Size Shed Do I Need? A Practical NZ Sizing Guide

Steel & Durability

8
  • Steel Shed Maintenance Checklist: What to Wash and Check Each Year
  • Stopping Condensation in a Steel Shed
  • Built for NZ Weather: Wind Zones, Snow and Earthquake Loads Explained
  • Pre-Painted, Zinc-Aluminium or Galvanised Steel: Which Finish Goes Where?
  • Building Near the Coast: Corrosion Zones, Steel and Cladding
  • Guarantee vs Durability: What a Shed Warranty Really Covers
  • How Long Does a Steel Shed Last?
  • Steel vs Timber Pole Sheds: An Honest Comparison

Kitset & Build Process

7
  • Progress Payments on a Commercial Build: How Payment Claims Work
  • Kitsets Delivered Anywhere in NZ and the Pacific: How It Works
  • Foundations for Steel Buildings: Slab, Piles or Footings?
  • How to Compare Shed and Steel Building Companies: 10 Questions to Ask
  • 7 Mistakes People Make When Buying a Shed (and How to Avoid Them)
  • Can I Build a Kitset Shed Myself? Skills, Tools and Time
  • What Happens After You Say Yes: The Steelspan Process from Quote to Handover

Projects & News

2
  • Meet the Team: 25+ Years of Steel Buildings at Steelspan
  • We’ve Moved: Steelspan’s New Home in Karaka
View Categories
  • Home
  • Advice
  • Kitset & Build Process
  • Foundations for Steel Buildings: Slab, Piles or Footings?

Foundations for Steel Buildings: Slab, Piles or Footings?

Steelspan Buildings
Updated on November 9, 2026
0:00 / 3:34
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)

The foundations are the part of a building nobody sees and everybody relies on. For a steel portal frame building, they do two jobs: carry the weight down into the ground, and hold the frames down when wind tries to lift or push them over. Here’s how it’s usually done.

How a portal frame meets the ground #

Each portal frame column stands on a steel base plate. It’s normally fixed to the concrete with mechanical anchor bolts, or with threaded rod set into the concrete with chemical anchoring. Where it’s beneficial, we’ll discuss using a cast-in bracket that extends into the floor instead: for example at a firewall for post-fire stability, on a very windy site, or on a very large span. Cast-in brackets take more set-up time, because they have to be secured so they don’t move while the concrete is poured. Most of the load in a steel building is concentrated at those columns, which is why the footings under them are bigger than the rest of the floor.

The common options #

OptionWhat it isSuits
Pad footingsA block of reinforced concrete under each columnMost portal frame buildings, with or without a floor slab
Slab with thickened footingsA reinforced floor slab with deeper, wider concrete under the columns and edgesWorkshops, garages for machinery, commercial buildings
Bored pilesConcrete piles drilled deeper into the groundSoft ground, fill, slopes, or high uplift loads; with or without a concrete floor
Hardfill floor with pad footingsFootings at columns, compacted hardfill betweenFarm sheds and hay barns where a full slab isn’t needed (bored piles can also be used this way)

What changes the design #

  • Ground conditions. Soft or filled ground, peat and some clay soils need specific design, which is where a geotechnical report earns its keep.
  • Wind uplift. Open-sided sheds, canopies and exposed sites need footings heavy or deep enough to stop the frame lifting.
  • Floor use. Forklifts, racking, car hoists and heavy machinery need a thicker, more heavily reinforced slab.
  • Slope. Sloping sites may need cut and fill, retaining or stepped foundations.

Getting the slab right #

  • Vapour barrier under the slab, to stop ground moisture coming up and condensing on the roof.
  • Reinforcing as specified by the engineer.
  • Control joints cut at the right spacing to manage shrinkage cracking.
  • Finish: power-floated for workshops, broom finish for wash-downs and ramps.
  • Falls towards doors or drains where you’ll wash down.

Accuracy is everything #

The footings and slab must be the right shape, size and height, and accurately set out to the drawings. If they’re out, the frame won’t sit properly and the build slows down while things are fixed. Where cast-in brackets are used, they have to be positioned exactly right too. Careful set-out and a check before the pour avoid the problem.

Who does what #

On design & build projects, Steelspan designs and builds the foundations. On kitset orders, our drawings show exactly what’s needed, and your concrete contractor builds to them. Every plan set, and every construction set we send, includes a set-out layout. We normally specify a flat, floated slab or footing top with nothing cast in, so there’s nothing to float around; cast-in brackets are a last resort for firewalls or large loads.

If you’re arranging the concrete yourself, choose a contractor you know, whose work you’ve seen, or who can show you similar jobs they’ve done. The finish matters, so this isn’t a job for someone just having a go. Engineers will usually specify certified concrete from a plant, at a set strength such as 25 MPa, rather than mixed on site.

Talk to Steelspan #

Tell us about your ground and how you’ll use the floor, and we’ll design foundations to suit. Use our Easy Shed Quote or call 0800 787 726.

Kitsets Delivered Anywhere in NZ and the Pacific: How It WorksHow to Compare Shed and Steel Building Companies: 10 Questions to Ask
Table of Contents
  • How a portal frame meets the ground
  • The common options
  • What changes the design
  • Getting the slab right
  • Accuracy is everything
  • Who does what
  • Talk to Steelspan

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest

Was this page helpful?

  • Happy
  • Normal
  • Sad
Find The Building or Shed Solution That Best Suits Your Needs
Consult With Us

Steel Framed Kitset buildings & sheds supplied anywhere in New Zealand or the Pacific. We design and supply our kitset buildings & sheds directly to you. We strive very hard to make every dollar you spend buy as much value as possible in your building supply.

Contact Us



281 Linwood Road, Karaka, Auckland 2580
New Zealand



0800 787 726



info@steelspan.co.nz

}

Business Hours:
Monday – Friday:
8:00 AM – 5:00 PM

Information

Terms, Conditions & General Specifications

Website Terms and Conditions

Privacy Policy

Cookies Policy

Disclaimer

FOLLOW US

  • Follow
  • Follow
  • Follow
  • Follow

© Copyright Steelspan Buildings 2013 | All Rights Reserved.

Our Site Crafted by: WebTrendz.

© 2026 Steelspan Buildings NZ