

0800 787 726



info@steelspan.co.nz

  • Follow
  • Follow
  • Follow
  • Follow
Get A Free Quote
  • Home
  • Easy Shed Quote
  • Products
    • Commercial & Industrial
    • Lifestyle & Rural
    • Storage & Utility
  • Gallery
  • Advice Docs and FAQ’s
  • Contact Us

0800 787 726

info@steelspan.co.nz

Costs & Pricing

8
  • How to Read and Compare Shed Quotes Like for Like
  • The Costs People Forget: Foundations, Site Work, Consent and Cartage
  • Pole Shed vs Steel Portal Frame: The Real Cost Comparison
  • Kitset or Full Design & Build: Which Works Out Cheaper?
  • Investment Boost: A 20% Upfront Tax Deduction on a New Commercial Building
  • What Does a Commercial or Industrial Building Cost per m² in 2026?
  • American Barn Prices in NZ: What You Get for Your Money
  • How Much Does a Steel Shed Cost in NZ? A 2026 Price Guide

Consents & Rules

7
  • How Long Does a Commercial Building Consent Take, and How Do You Avoid Delays?
  • Insulation (H1) Rules: When a Shed or Commercial Building Needs Them
  • What the 2026 Building Amendment Bill Means for People Building
  • Fire Rules for Commercial Steel Buildings, in Plain English
  • Building Consent vs Resource Consent: Height, Boundaries and Site Coverage
  • Consent-Exempt Farm Sheds up to 110 m²: What Actually Qualifies
  • Do I Need Building Consent for a Shed in NZ? The 2026 Rules

Planning & Design

17
  • Plant Rooms and Equipment Buildings: Steel Buildings for Infrastructure
  • Extending an Existing Building: New Bays, Lean-tos and Matching the Old
  • Hobby Sheds and She Sheds: Small Steel Buildings With a Purpose
  • Aircraft Hangars: Sizes, Doors and Consent
  • Mezzanine Floors in Sheds and Commercial Buildings: Timber, Steel or Concrete?
  • Canopies and Covered Loading Areas for Commercial Sites
  • Warehouse Design That Can Grow With Your Business
  • Hay Barns: Keeping Feed Dry (and Safe) Through NZ Weather
  • Commercial Storage Units as an Investment: What to Plan Before You Build
  • Designing a Workshop Shed: Power, Light, Insulation and Mezzanine
  • Picking the Right Site for Your Shed: Access, Slope, Ground and Orientation
  • Choosing Doors for Your Shed: Roller, Sectional, Sliding or Open Bays
  • Lifestyle Block Sheds: Workshop, Storage, Boat and Caravan in One Building
  • Designing a Farm Implement Shed Around Today’s (and Tomorrow’s) Machinery
  • Clear Span Explained: No Internal Posts, No Knee Braces, up to 30 m
  • How High Should Your Shed Be?
  • What Size Shed Do I Need? A Practical NZ Sizing Guide

Steel & Durability

8
  • Steel Shed Maintenance Checklist: What to Wash and Check Each Year
  • Stopping Condensation in a Steel Shed
  • Built for NZ Weather: Wind Zones, Snow and Earthquake Loads Explained
  • Pre-Painted, Zinc-Aluminium or Galvanised Steel: Which Finish Goes Where?
  • Building Near the Coast: Corrosion Zones, Steel and Cladding
  • Guarantee vs Durability: What a Shed Warranty Really Covers
  • How Long Does a Steel Shed Last?
  • Steel vs Timber Pole Sheds: An Honest Comparison

Kitset & Build Process

7
  • Progress Payments on a Commercial Build: How Payment Claims Work
  • Kitsets Delivered Anywhere in NZ and the Pacific: How It Works
  • Foundations for Steel Buildings: Slab, Piles or Footings?
  • How to Compare Shed and Steel Building Companies: 10 Questions to Ask
  • 7 Mistakes People Make When Buying a Shed (and How to Avoid Them)
  • Can I Build a Kitset Shed Myself? Skills, Tools and Time
  • What Happens After You Say Yes: The Steelspan Process from Quote to Handover

Projects & News

2
  • Meet the Team: 25+ Years of Steel Buildings at Steelspan
  • We’ve Moved: Steelspan’s New Home in Karaka
View Categories
  • Home
  • Advice
  • Steel & Durability
  • Pre-Painted, Zinc-Aluminium or Galvanised Steel: Which Finish Goes Where?

Pre-Painted, Zinc-Aluminium or Galvanised Steel: Which Finish Goes Where?

Steelspan Buildings
Updated on November 9, 2026
0:00 / 3:00
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)

Most steel buildings in New Zealand use three types of coated steel, often all on the same building. Knowing which is which helps you read a quote and pick the right finish for your site.

The three finishes #

FinishWhat it isWhere it’s usedLook
GalvanisedSteel with a zinc coatingFrames, purlins and girts; Steelspan uses Z275, a 275 g per m² zinc coatingDull grey
Zinc-aluminium coatedSteel with an aluminium and zinc alloy coatingUnpainted roof and wall cladding, especially on farm and utility buildingsBright silver, dulling with age
Pre-paintedSteel with paint layers over a metallic coatingRoof and wall cladding where colour, looks or extra durability matterWide colour range

Unpainted or pre-painted? #

Unpainted zinc-aluminium coated steel is usually the cheaper cladding option and is common on farm sheds and utility buildings. It’s tough, but it has limits: some environments and some contact with other materials don’t suit it, so check the manufacturer’s guidance for your site and use.

Pre-painted steel costs more, but you choose the colour, and the paint adds a layer of protection. On lifestyle blocks and commercial sites, colour is often non-negotiable. Near the coast, the higher-grade pre-painted products are often the right call.

Not all pre-painted steel is the same #

Manufacturers make several grades of pre-painted steel for different environments. Their guidance rates each for moderate, severe and very severe coastal conditions, and some aren’t recommended for the harshest sites. There are also anti-condensation sheets, which have a fleece layer bonded to the underside of the sheet to absorb condensation, and can replace a separate roof underlay in suitable buildings. These sheets aren’t recommended for continually wet interiors such as intensive animal shelters.

Thickness #

Roof and wall sheets come in different base metal thicknesses, commonly 0.40 mm and 0.55 mm. Thicker sheets are stiffer and tougher underfoot, and can span further between purlins. Check what a quote includes.

Keep metals compatible #

Some metals don’t mix. Runoff from copper or brass, for example, can damage zinc and aluminium-zinc coatings. Flashings, gutters, fixings and anything that drains onto the roof need to be compatible with the cladding.

How we choose #

We start with your site’s environment and the building’s use, then pick a finish that suits both, and explain the maintenance it needs. Our quotes typically offer two profiles: a five-rib trapezoidal profile or a corrugated profile. Both span well and are great value for money. These days most customers choose a pre-painted finish, which lets them pick the colour and gives better corrosion protection. Pre-painted steel normally comes in around 20 colours. Ranges vary between manufacturers, but we can usually source the colour you want, and pricing may vary slightly for some colours.

Pre-painted steel costs more up front than zinc-aluminium coated steel, but you’d be very unlikely to paint the building afterwards for that same difference. Once you allow for scaffolding, edge protection, water blasting, multiple coats and all the labour, painting later often costs many times more. It’s worth weighing up at the quote stage.

Talk to Steelspan #

Not sure which finish suits your site? Tell us where you’re building. Use our Easy Shed Quote or call 0800 787 726.

Built for NZ Weather: Wind Zones, Snow and Earthquake Loads ExplainedBuilding Near the Coast: Corrosion Zones, Steel and Cladding
Table of Contents
  • The three finishes
  • Unpainted or pre-painted?
  • Not all pre-painted steel is the same
  • Thickness
  • Keep metals compatible
  • How we choose
  • Talk to Steelspan

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest

Was this page helpful?

  • Happy
  • Normal
  • Sad
Find The Building or Shed Solution That Best Suits Your Needs
Consult With Us

Steel Framed Kitset buildings & sheds supplied anywhere in New Zealand or the Pacific. We design and supply our kitset buildings & sheds directly to you. We strive very hard to make every dollar you spend buy as much value as possible in your building supply.

Contact Us



281 Linwood Road, Karaka, Auckland 2580
New Zealand



0800 787 726



info@steelspan.co.nz

}

Business Hours:
Monday – Friday:
8:00 AM – 5:00 PM

Information

Terms, Conditions & General Specifications

Website Terms and Conditions

Privacy Policy

Cookies Policy

Disclaimer

FOLLOW US

  • Follow
  • Follow
  • Follow
  • Follow

© Copyright Steelspan Buildings 2013 | All Rights Reserved.

Our Site Crafted by: WebTrendz.

© 2026 Steelspan Buildings NZ