

0800 787 726



info@steelspan.co.nz

  • Follow
  • Follow
  • Follow
  • Follow
Get A Free Quote
  • Home
  • Easy Shed Quote
  • Products
    • Commercial & Industrial
    • Lifestyle & Rural
    • Storage & Utility
  • Gallery
  • Advice Docs and FAQ’s
  • Contact Us

0800 787 726

info@steelspan.co.nz

Costs & Pricing

8
  • How to Read and Compare Shed Quotes Like for Like
  • The Costs People Forget: Foundations, Site Work, Consent and Cartage
  • Pole Shed vs Steel Portal Frame: The Real Cost Comparison
  • Kitset or Full Design & Build: Which Works Out Cheaper?
  • Investment Boost: A 20% Upfront Tax Deduction on a New Commercial Building
  • What Does a Commercial or Industrial Building Cost per m² in 2026?
  • American Barn Prices in NZ: What You Get for Your Money
  • How Much Does a Steel Shed Cost in NZ? A 2026 Price Guide

Consents & Rules

7
  • How Long Does a Commercial Building Consent Take, and How Do You Avoid Delays?
  • Insulation (H1) Rules: When a Shed or Commercial Building Needs Them
  • What the 2026 Building Amendment Bill Means for People Building
  • Fire Rules for Commercial Steel Buildings, in Plain English
  • Building Consent vs Resource Consent: Height, Boundaries and Site Coverage
  • Consent-Exempt Farm Sheds up to 110 m²: What Actually Qualifies
  • Do I Need Building Consent for a Shed in NZ? The 2026 Rules

Planning & Design

17
  • Plant Rooms and Equipment Buildings: Steel Buildings for Infrastructure
  • Extending an Existing Building: New Bays, Lean-tos and Matching the Old
  • Hobby Sheds and She Sheds: Small Steel Buildings With a Purpose
  • Aircraft Hangars: Sizes, Doors and Consent
  • Mezzanine Floors in Sheds and Commercial Buildings: Timber, Steel or Concrete?
  • Canopies and Covered Loading Areas for Commercial Sites
  • Warehouse Design That Can Grow With Your Business
  • Hay Barns: Keeping Feed Dry (and Safe) Through NZ Weather
  • Commercial Storage Units as an Investment: What to Plan Before You Build
  • Designing a Workshop Shed: Power, Light, Insulation and Mezzanine
  • Picking the Right Site for Your Shed: Access, Slope, Ground and Orientation
  • Choosing Doors for Your Shed: Roller, Sectional, Sliding or Open Bays
  • Lifestyle Block Sheds: Workshop, Storage, Boat and Caravan in One Building
  • Designing a Farm Implement Shed Around Today’s (and Tomorrow’s) Machinery
  • Clear Span Explained: No Internal Posts, No Knee Braces, up to 30 m
  • How High Should Your Shed Be?
  • What Size Shed Do I Need? A Practical NZ Sizing Guide

Steel & Durability

8
  • Steel Shed Maintenance Checklist: What to Wash and Check Each Year
  • Stopping Condensation in a Steel Shed
  • Built for NZ Weather: Wind Zones, Snow and Earthquake Loads Explained
  • Pre-Painted, Zinc-Aluminium or Galvanised Steel: Which Finish Goes Where?
  • Building Near the Coast: Corrosion Zones, Steel and Cladding
  • Guarantee vs Durability: What a Shed Warranty Really Covers
  • How Long Does a Steel Shed Last?
  • Steel vs Timber Pole Sheds: An Honest Comparison

Kitset & Build Process

7
  • Progress Payments on a Commercial Build: How Payment Claims Work
  • Kitsets Delivered Anywhere in NZ and the Pacific: How It Works
  • Foundations for Steel Buildings: Slab, Piles or Footings?
  • How to Compare Shed and Steel Building Companies: 10 Questions to Ask
  • 7 Mistakes People Make When Buying a Shed (and How to Avoid Them)
  • Can I Build a Kitset Shed Myself? Skills, Tools and Time
  • What Happens After You Say Yes: The Steelspan Process from Quote to Handover

Projects & News

2
  • Meet the Team: 25+ Years of Steel Buildings at Steelspan
  • We’ve Moved: Steelspan’s New Home in Karaka
View Categories
  • Home
  • Advice
  • Costs & Pricing
  • Investment Boost: A 20% Upfront Tax Deduction on a New Commercial Building

Investment Boost: A 20% Upfront Tax Deduction on a New Commercial Building

Steelspan Buildings
Updated on November 9, 2026
0:00 / 2:37
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)

Since 22 May 2025, New Zealand businesses can claim an immediate 20% tax deduction on the cost of new business assets, and that includes new commercial and industrial buildings. It’s called Investment Boost. For a business planning a new warehouse, workshop or factory, it’s worth understanding before you set your budget.

This post explains the scheme in general terms. It isn’t tax advice, so talk to your accountant about your situation.

How it works #

In the income year a new asset is first available for use, you can deduct 20% of its cost up front, on top of the usual depreciation rules. There is no cap on the value of the investment. Inland Revenue’s guidance is on its Investment Boost pages.

Which buildings qualify #

  • Yes: new commercial and industrial buildings, and improvements to existing ones, bought or built and first available for use on or after 22 May 2025.
  • No: residential rental buildings, improvements to residential buildings, and second-hand assets already used in New Zealand.
  • Ask your accountant: farm buildings and mixed-use buildings, which need specific advice.

Why it matters more for buildings #

Commercial buildings currently have a 0% tax depreciation rate. That means the 20% Investment Boost deduction is, in practice, the main tax deduction available on the building itself, rather than just bringing depreciation forward. Depreciation recovery rules can still apply if you later sell the building for more than its tax book value.

A simple illustration #

Say a company builds a new warehouse that costs $500,000.

  • Investment Boost deduction: 20% of $500,000 = $100,000.
  • At the 28% company tax rate, that’s up to $28,000 less tax in that income year.

The real numbers depend on your structure, GST position and what counts as part of the building, which is why the accountant conversation matters.

Timing: the “available for use” date #

The deduction falls in the income year the building is first available for use, not when you sign the contract or pay the deposit. Inland Revenue’s own examples show a building isn’t available for use until it can legally be occupied, typically when the code compliance certificate is issued. If your balance date is close, the completion date can move the deduction from one year to the next.

How Steelspan can help #

  • We give you a clear cost breakdown your accountant can work from.
  • We give you a realistic programme, so you can plan which tax year the building lands in.
  • Our process takes you from budget estimate to firm price before you commit to construction.

We can also split building costs from plant and fit-out costs on our invoices, so your accountant can see exactly what’s what.

Talk to Steelspan #

Planning a new commercial or industrial building? Send us the basics and we’ll give you a budget estimate you can take to your accountant. Use our Easy Shed Quote or call 0800 787 726.

Kitset or Full Design & Build: Which Works Out Cheaper?What Does a Commercial or Industrial Building Cost per m² in 2026?
Table of Contents
  • How it works
  • Which buildings qualify
  • Why it matters more for buildings
  • A simple illustration
  • Timing: the “available for use” date
  • How Steelspan can help
  • Talk to Steelspan

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest

Was this page helpful?

  • Happy
  • Normal
  • Sad
Find The Building or Shed Solution That Best Suits Your Needs
Consult With Us

Steel Framed Kitset buildings & sheds supplied anywhere in New Zealand or the Pacific. We design and supply our kitset buildings & sheds directly to you. We strive very hard to make every dollar you spend buy as much value as possible in your building supply.

Contact Us



281 Linwood Road, Karaka, Auckland 2580
New Zealand



0800 787 726



info@steelspan.co.nz

}

Business Hours:
Monday – Friday:
8:00 AM – 5:00 PM

Information

Terms, Conditions & General Specifications

Website Terms and Conditions

Privacy Policy

Cookies Policy

Disclaimer

FOLLOW US

  • Follow
  • Follow
  • Follow
  • Follow

© Copyright Steelspan Buildings 2013 | All Rights Reserved.

Our Site Crafted by: WebTrendz.

© 2026 Steelspan Buildings NZ