0800 787 726



info@steelspan.co.nz

  • Follow
  • Follow
  • Follow
  • Follow
Get A Free Quote
  • Home
  • Easy Shed Quote
  • Products
    • Commercial & Industrial
    • Lifestyle & Rural
    • Storage & Utility
  • Gallery
  • Advice Docs and FAQ’s
  • Contact Us

0800 787 726

info@steelspan.co.nz

Costs & Pricing

8
  • How to Read and Compare Shed Quotes Like for Like
  • The Costs People Forget: Foundations, Site Work, Consent and Cartage
  • Pole Shed vs Steel Portal Frame: The Real Cost Comparison
  • Kitset or Full Design & Build: Which Works Out Cheaper?
  • Investment Boost: A 20% Upfront Tax Deduction on a New Commercial Building
  • What Does a Commercial or Industrial Building Cost per m² in 2026?
  • American Barn Prices in NZ: What You Get for Your Money
  • How Much Does a Steel Shed Cost in NZ? A 2026 Price Guide

Consents & Rules

7
  • How Long Does a Commercial Building Consent Take, and How Do You Avoid Delays?
  • Insulation (H1) Rules: When a Shed or Commercial Building Needs Them
  • What the 2026 Building Amendment Bill Means for People Building
  • Fire Rules for Commercial Steel Buildings, in Plain English
  • Building Consent vs Resource Consent: Height, Boundaries and Site Coverage
  • Consent-Exempt Farm Sheds up to 110 m²: What Actually Qualifies
  • Do I Need Building Consent for a Shed in NZ? The 2026 Rules

Planning & Design

17
  • Plant Rooms and Equipment Buildings: Steel Buildings for Infrastructure
  • Extending an Existing Building: New Bays, Lean-tos and Matching the Old
  • Hobby Sheds and She Sheds: Small Steel Buildings With a Purpose
  • Aircraft Hangars: Sizes, Doors and Consent
  • Mezzanine Floors in Sheds and Commercial Buildings: Timber, Steel or Concrete?
  • Canopies and Covered Loading Areas for Commercial Sites
  • Warehouse Design That Can Grow With Your Business
  • Hay Barns: Keeping Feed Dry (and Safe) Through NZ Weather
  • Commercial Storage Units as an Investment: What to Plan Before You Build
  • Designing a Workshop Shed: Power, Light, Insulation and Mezzanine
  • Picking the Right Site for Your Shed: Access, Slope, Ground and Orientation
  • Choosing Doors for Your Shed: Roller, Sectional, Sliding or Open Bays
  • Lifestyle Block Sheds: Workshop, Storage, Boat and Caravan in One Building
  • Designing a Farm Implement Shed Around Today’s (and Tomorrow’s) Machinery
  • Clear Span Explained: No Internal Posts, No Knee Braces, up to 30 m
  • How High Should Your Shed Be?
  • What Size Shed Do I Need? A Practical NZ Sizing Guide

Steel & Durability

8
  • Steel Shed Maintenance Checklist: What to Wash and Check Each Year
  • Stopping Condensation in a Steel Shed
  • Built for NZ Weather: Wind Zones, Snow and Earthquake Loads Explained
  • Pre-Painted, Zinc-Aluminium or Galvanised Steel: Which Finish Goes Where?
  • Building Near the Coast: Corrosion Zones, Steel and Cladding
  • Guarantee vs Durability: What a Shed Warranty Really Covers
  • How Long Does a Steel Shed Last?
  • Steel vs Timber Pole Sheds: An Honest Comparison

Kitset & Build Process

7
  • Progress Payments on a Commercial Build: How Payment Claims Work
  • Kitsets Delivered Anywhere in NZ and the Pacific: How It Works
  • Foundations for Steel Buildings: Slab, Piles or Footings?
  • How to Compare Shed and Steel Building Companies: 10 Questions to Ask
  • 7 Mistakes People Make When Buying a Shed (and How to Avoid Them)
  • Can I Build a Kitset Shed Myself? Skills, Tools and Time
  • What Happens After You Say Yes: The Steelspan Process from Quote to Handover

Projects & News

2
  • Meet the Team: 25+ Years of Steel Buildings at Steelspan
  • We’ve Moved: Steelspan’s New Home in Karaka
View Categories
  • Home
  • Advice
  • Kitset & Build Process
  • What Happens After You Say Yes: The Steelspan Process from Quote to Handover

What Happens After You Say Yes: The Steelspan Process from Quote to Handover

Steelspan Buildings
Updated on November 9, 2026
0:00 / 3:32
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)

Most of the stress in a building project comes from not knowing what happens next. So here is exactly how a Steelspan design & build project runs, step by step. Kitset orders follow a shorter path, covered at the end.

1. Enquiry #

You get in touch through our Easy Shed Quote, by phone or by email. Your enquiry is logged and assigned to one of our sales leads, Patrick or Oliver, who stays your main contact through to handover.

2. Site visit and measure #

We visit, measure up, take photos (often with a drone) and talk through how you’ll use the building. Seeing the site early flags access, slope and drainage before they become surprises. The drone is particularly useful near an existing building, or for inaccessible parts of the site, such as a drop-off or a boggy area.

A site visit isn’t needed for every project. We supply many kitsets around the country without ever seeing the site. What matters is enough information: photos, a Google pin with the exact location, a geotech report if you have one, and the heights of equipment going in. A visit can still help if you’re short on time and want us to help make key decisions, measure clearances and talk through ways to get what you need within your budget.

3. Budget estimate #

We send a written budget estimate, usually within a week, and tell you up front when to expect it. It’s a realistic ballpark, with the assumptions spelled out. We follow up within a couple of days to answer questions.

4. Pre-construction services agreement #

If you want to go ahead, we sign a pre-construction services agreement. It covers the design work and consultants needed to turn the estimate into a firm price, usually for a fixed fee, so you know what getting to a fixed price will cost. Once paid for, the plans and reports are yours.

5. Detailed design #

This is where the unknowns get removed: earthworks, drainage, stormwater, retaining, the concrete floor and foundations, the frame, linings, electrical, plumbing and any fire or energy requirements. Our engineer, our in-house designer and specialist consultants do the work.

6. Firm quote and contract #

We present a firm price and timeframe under a written construction contract: a small works contract, or NZS 3915 for larger jobs. Before it goes to you, we check it against the original estimate, so you’re not blindsided.

7. Building and resource consent #

We prepare and lodge the consent applications and handle the council’s questions. Councils have 20 working days to decide a building consent, with the clock paused while they wait for any further information.

8. Pre-start #

Once consent is granted, we confirm the programme and subcontractors and check the timeframe with you again.

9. Construction #

A project manager runs the site day to day, coordinates trades and makes sure every inspection and producer statement happens. You get progress updates through your Steelspan contact.

10. Handover #

We walk the building with you, log anything that needs fixing and get it fixed. You receive your warranty documents, and we help pull together the paperwork for your code compliance certificate.

Kitset orders #

For a kitset, the path is shorter: quote, order, engineered drawings, consent (if we’re handling it), manufacture, delivery to your site, then you or your builder put it up. As a rule of thumb, allow about 4 weeks for design, 4 weeks for council and 4 to 6 weeks for delivery of your kitset materials. We can often improve on that. Council usually takes the full 20 working days, but design and production can sometimes be shortened, depending on workloads. Talk to us before you sign up and we can make enquiries to confirm timing for you.

Talk to Steelspan #

Whichever route you take, the first step is the same. Start with our Easy Shed Quote or call 0800 787 726.

Can I Build a Kitset Shed Myself? Skills, Tools and TimeProgress Payments on a Commercial Build: How Payment Claims Work
Table of Contents
  • 1. Enquiry
  • 2. Site visit and measure
  • 3. Budget estimate
  • 4. Pre-construction services agreement
  • 5. Detailed design
  • 6. Firm quote and contract
  • 7. Building and resource consent
  • 8. Pre-start
  • 9. Construction
  • 10. Handover
  • Kitset orders
  • Talk to Steelspan

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest

Was this page helpful?

  • Happy
  • Normal
  • Sad
Find The Building or Shed Solution That Best Suits Your Needs
Consult With Us

Steel Framed Kitset buildings & sheds supplied anywhere in New Zealand or the Pacific. We design and supply our kitset buildings & sheds directly to you. We strive very hard to make every dollar you spend buy as much value as possible in your building supply.

Contact Us



281 Linwood Road, Karaka, Auckland 2580
New Zealand



0800 787 726



info@steelspan.co.nz

}

Business Hours:
Monday – Friday:
8:00 AM – 5:00 PM

Information

Terms, Conditions & General Specifications

Website Terms and Conditions

Privacy Policy

Cookies Policy

Disclaimer

FOLLOW US

  • Follow
  • Follow
  • Follow
  • Follow

© Copyright Steelspan Buildings 2013 | All Rights Reserved.

Our Site Crafted by: WebTrendz.

© 2026 Steelspan Buildings NZ